ACI Documentation

Closure Groups

Executive Summary

Closure Groups lets administrators maintain named groups of closure dates, for example a "Statutory Holidays" group listing each day (and optionally the hours) on which a site is closed. Create a group here, then open it to add the individual closure dates. The groups are maintained inside the integration only; nothing on this screen is sent to AlayaCare.

Key Features

  • Add closure groups
  • Open a group to rename it
  • Add, edit and delete the closure dates in a group, each with a name, a date and an optional from/to time
  • A date with no times entered closes the whole day (00:00 to 23:59)

Typical Workflow

  1. Click Add, enter a Name and click Save.
  2. Click the edit icon (or right-click the group and choose Edit) to open the group.
  3. On the Dates tab, click Add, enter the date details, and click Save.
  4. Use the edit and delete icons on a date to correct or remove it.
  5. Use Edit beside the group name to rename the group, or the back link in the page title to return to the list.

Available Permissions

The following permissions are available to be assigned to AlayaCare Roles:

AttributeWhat It Controls
ViewOpen the page and its group detail page

Main Grid

Lists every closure group (14 rows per page).

ColumnDescription
NameName of the closure group.
Manage RecordsEdit icon that opens the group.

Actions

ButtonDescription
AddOpens the Closure Group dialog to create a group.
Edit (row icon, or right-click a row)Opens the Closure Group Details page for that group.

Dialog Components

Closure Group

Opens from Add. Enter the Name (required; "Name is required" is shown if it is blank) and click Save, or Cancel to close. The system records who added the group and when. Closure groups are not deleted from this screen.

Closure Group Details

Opens when you edit a group. The title bar has a back link to the list of groups. The Group Name is shown read-only; click Edit beside it to open a dialog where you can change the Name and click Save (a warning "Update Failed" is shown if the change cannot be saved).

Tabs

TabPurpose
DatesThe closure dates that belong to the group.
Dates - Grid

Lists the closure dates of the group (14 rows per page).

ColumnDescription
NameName of the closure (for example the holiday name).
DateClosure date.
From TimeTime the closure starts (HH:mm).
To TimeTime the closure ends (HH:mm).
Manage RecordsEdit and delete icons.
Dates - Grid Actions
ButtonDescription
AddOpens the Date dialog to add a closure date.
Edit (row icon, or right-click a row)Opens the Date dialog for that date.
Delete (row icon, or right-click a row)Deletes the date after you confirm "Are you sure you want to delete this date?".
Date dialog
FieldDescription
NameName of the closure. Required.
Closure DateDate of the closure. Required.
From TimeStart time, in 30-minute steps. If left blank, 00:00 is used.
To TimeEnd time, in 30-minute steps. If left blank, 23:59 is used. It must be later than the From Time, otherwise "To Time has to be later than from Time" is shown.

The system records who last edited the date and when (and who added it).